4D BIM Modeling: Improve Cost, Scheduling and Coordination of Building Project |
|
|
|
|
Written by Administrator| Posted:Tuesday, 12 January 2010 06:16
|
Added in:
Building Information Modeling
| |||
|
Better Integration and Cost Estimation: Integrating human resources, equipment and material resources with the BIM model, 4D scheduling helps to better schedule and cost estimate of the project. 4D BIM also monitors procurement status of project materials. Conflict Detection and Resolution: During design and construction phase, potential spatial conflicts may arise between building components. It is not easy to identify or predict these conflicts using 2D or 3D layouts. But, 4D model identifies various issues related to space, schedule and sequencing, and resolve them ahead of the construction process. Improved Time Management: Integrated with BIM modeling, 4D scheduling helps the owner as well as project team to easily visualize time constraints and opportunities of improvement and investment in the project. Maximization of Critical Resources: 4D model allows the project team to evaluate various alternatives resources and scopes of work over a period of time to optimize the resources and labor accordingly. 4D Project Planning with BIM By adding the schedule date to the model components, project team improves the plan and integrates the communication among various divisions. With the progress of time, project team programmatically links schedule to BIM model to evaluate various construction options to make the optimum decision. There are two methods for linking a BIM model to a project plan-
Autodesk has developed a software tool which establishes a bidirectional link between Revit and MS project to track the progress of the project against pre-set deadline. The particular software tool contains a new Revit function called Export to MS Project which exports presorted (by level and category) building components to a MS Project and keeps the project update for quick scheduling. Similarly, another Revit function categorized as Import from MS Project, imports the attributes of affected Revit components with start and finish dates to keep BIM (a Revit platform) up to date. Thus, changes are incorporated and updated in either way. Project team member can view the planning information in Revit and can show it to the concerned home owners or building developers or stakeholders. With the help of Revit, users can view the progress of the project against time line set previously and what are the buildings components are scheduled in the coming months. This information helps the project team to analyze whether there are any lackadaisical responses. Each building block can be assigned to a phase and updated from the MS project automatically. Users can view the progress of a particular building component or all components in all phases as desired. The progress of a component is passed to MS Project during the Export to MS Project process, and the BIM becomes updated during Import from MS Project. Second Method: 4D Visualization Innovaya has developed a 4D planning and constructability analysis tool called Visual Simulation 3.0 which integrates Revit/BIM with the MS Project and presents 4D visualizations of the building objects. With the Revit API function, it exports the Revit model to the Innovaya file format. The model later is imported into Visual Simulation. The tool includes a standard 3D/4D environment for both standard model navigation as well as 4D visualization. With Revit, project planning is developed and construction tasks based on building hierarchy are created in Visual Simulation. These tasks are automatically linked with the BIM objects. As the project progresses and the need for a detailed project planning is felt, the tool establishes a link to MS Project with import, export and synchronize functions. When a project plan is established, users can visually link model objects and scheduling tasks, thus optimizing task sequences and resulting in project time savings. Users can play what-if scenarios in traditional Gantt chart and view the ripple effect in the 4D model. Thus, 4D environment compactly featured with a variety of time/schedule filters 4D environment allows users to visually associate building model objects and tasks. Innovaya has developed another tool called Visual Estimating 9.4 - the BIM-based estimating solution to integrate AutoCAD and all Revit applications with MC2 ICE and Sage Timberline Estimating. Conclusion With the constant success of BIM in the design field, home builders and architectural firms are turning to BIM application for their own uses. With 3D supported BIM, designers would show the clients and prospects how their buildings would resemble after construction much before the real ground work begins. With the continuous advances in technology, forward-thinking firms have developed advanced features and ways to improve quality and reduce wastage of limited resources. Linking MS Project scheduling to the advanced software like Revit is one of the latest and crucial developments in the field of building applications development. Architectural firms have started using 4D model for a better project planning. With 4D visualization, it has become easy to view planning information as desired. 4D BIM modeling is gaining the momentum in the AEC industry, delivering significant benefits to home builders, architectural firms and real estate developers – improved team coordination and communication between designers and builders; smooth transfer of the project planning; improved delivery time; savings on time and cost. Senior BIM technologist Scott Bloss at Dal Pos has roghtly put it, "4D BIM is a must-have tool in our digital gangbox." Bookmarks |
|||||||||||||||